Equinox Restores Wind Turbine Generator in Boujdour, Western Sahara


A team from our rope access division were deployed to Boujdour, Western Sahara to carry out essential maintenance work on a Siemens 2.3 megawatt wind turbine after a devastating electrical fire. An internal restoration programme of works was carried out to bring the turbine back to its original state. All main cables and components were removed and reinstalled on this project using industrial rope access & rigging.

Access to the working areas was achieved using a team of IRATA trained rope access technicians using industrial rope access methods and techniques. The project was carried out safely and within the estimated time scale.

Associated Clients on this project:
Siemens Gamesa Renewable Energy